Chance's Computerized Christmas Lights
  • Home
  • This Year
    • 2012 Videos
    • Setup Status 2012
  • About
    • General
    • Computer Control
    • Lights
  • Visit Us
    • When visiting CNRLights...
    • Driving Directions
  • Videos
    • Videos - 2011
    • Videos - 2010/2009
  • Past Years
    • 2012
    • 2011 >
      • Setup Status - 2011
      • Changes
      • Setup Photos
      • Power Emergency
    • 2010 >
      • Setup Status
      • Changes
      • Photos
    • 2009 >
      • Show Info
      • Setup Status
      • Photos
      • Christmas in July 2009
  • Guestbook
  • Contact
  • Thanks To...
  • Other Displays

2009 Setup Status

11-27-2009

  • Finished lights on the right of the driveway
  • Put up some lights in the backyard for tonight's LightUp!
  • Controller died - Needs replaced/fixed ASAP
  • Tweaked Christmas Canon sequence/audio file

11-26-2009

  • Finished sequencing Sleigh Ride by Relient K

11-25-2009

  • Started sequencing Sleigh Ride by Relient K
  • Started lights on the right of the driveway

11-24-2009

  • Put proper ends on the controller data cable
  • Finished sequencing Queen of the Winter Night

11-23-2009

  • Took photos for The Record Herald
  • Repaired damaged clear light strings
  • Painted sign for the display with the website name

11-22-2009

  • Switched controller data cable from Cat5 to telephone
  • Tested all clear lights
  • Put clear lights on front trees
  • Put out candy canes
  • Corrected wiring problem in controller causing ground fault
  • Recorded video of Amazing Grace

11-21-2009

  • Tested and figured out problem with controller (bent pin on Ethernet port)
  • Repaired controller and synced with laptop
  • Configured channels in LOR editor
  • Did a test run of Amazing Grace with the lights/controller
  • Set up timings for O Come O Come Emmanuel

11-20-2009

  • Ran power/audio/data cables from inside the house
  • Set up speakers in yard and stereo in basement
  • Conntected stereo to the show laptop
  • Connected show laptop to my LAN and the LOR controller
  • Tested Light-O-Rama controller - connection errors, will need to be resolved tomorrow or I will be overnighting the controller to LOR.

11-19-2009

  • Sequenced all of Amazing Grace
  • Figured out amperage for each channel of lights and separated evenly between two sides of controller

11-18-2009

  • Mounted controller to middle tree
  • Ran all extension cords to bushes/trees/border/icicles
  • Ran main power cords to house
Site Contents Copyright CNRLights 2012
Powered by Create your own unique website with customizable templates.